Switching LMS: A Step-by-Step Migration Guide
Moving from one LMS to another? Plan data, content, integrations and communication so learners and records arrive safely.

Switching learning platforms is common. Organisations outgrow their first LMS, consolidate after a merger, or need features the old system lacks. A migration touches users, content, history and habits, so it needs a plan.
Step 1: Decide what to move
Not everything deserves to move. Run an audit of your current system:
- Users: active users only, or historical ones too?
- Courses: which are still in use? Many systems hold years of outdated content.
- Completion records: which records must you keep for compliance or audit?
- Certificates: active certificates with expiry dates need to carry over.
- Learning paths and enrolment rules: document them, as they rarely export cleanly.
- Reports: list the reports people rely on so you can rebuild them.
Archive the rest. A migration is a good moment to clean house.
Step 2: Check what the old system can export
Ask your current vendor, early, what you can export and in what format. Typical exports:
- User lists as CSV
- Completion history as CSV or through an API
- Course packages in SCORM format, if the content was built in an external tool
- Native courses built in the old LMS, which may not export at all
If native courses cannot export, plan to rebuild them or use this as a chance to refresh them.
Step 3: Map the data
Create a mapping sheet between old and new fields: user IDs, departments, job roles, course IDs, completion dates, scores and certificate expiry. Small mismatches, such as date formats or department names, cause most migration errors.
Step 4: Plan for historical records
Three common approaches:
- Import history into the new LMS as completed records. Best for audit and compliance.
- Keep an archive of reports from the old system as files.
- Run both systems in read-only mode for a short period.
Many organisations combine options 1 and 2.
Step 5: Rebuild integrations
Single sign-on, HR system sync, video tools and any API connections need to be set up again. Test them in a sandbox before go-live.
Step 6: Test with a pilot group
Move a small group first. Check that:
- They can sign in
- Their history appears correctly
- Assigned courses show up
- Certificates show the right expiry dates
- Managers see their teams
Fix issues before migrating everyone.
Step 7: Communicate early and often
Tell learners and managers:
- Why you are changing systems
- When the switch happens
- What they need to do (often nothing, if single sign-on is set up)
- Where to get help
Short videos or a one-page guide work better than long manuals.
Step 8: Cut over and overlap
Pick a quiet period, away from compliance deadlines. Freeze new enrolments in the old system, run the final data export, import into the new system and switch the links. Keep the old system available for read-only access until you are sure nothing is missing, but avoid running both for long, as it confuses learners and doubles costs.
Common pitfalls
- Contract overlap not planned. Check your notice period and agree a short extension if needed.
- Assuming content will just work. Test every SCORM package in the new system.
- Losing completion dates. Some imports record the import date as the completion date. Check this carefully.
- Forgetting managers. Rebuild their reports before launch.
Frequently asked questions
How long does an LMS migration take?
For a small organisation with simple content, a migration can take a few weeks. Mid-sized organisations often need two to four months. Large enterprises with many integrations, audiences and years of records may need six months or more.
Can SCORM courses move to a new LMS unchanged?
Usually, yes. SCORM packages are designed to work across systems. Test every package in the new platform anyway, because settings such as completion rules, window sizes and scoring can behave differently.
What about courses built inside the old LMS?
Native courses often cannot be exported in a reusable format. You may need to rebuild them, recreate them in an authoring tool, or export the underlying videos and documents and reassemble them.
Should we migrate all historical records?
Migrate what you need for compliance, audit and active certifications. Older records can often be archived as reports. Check your retention policy before deciding.
Who should own the migration?
Name one project owner on your side and one on the vendor side. The owner coordinates data exports, testing, communication and sign-off. Without clear ownership, migrations drift.
A simple timeline
| Phase | Typical length |
|---|---|
| Audit and planning | 2 to 4 weeks |
| Exports and data mapping | 2 to 3 weeks |
| Configuration and integrations | 3 to 6 weeks |
| Pilot | 2 weeks |
| Full cutover | 1 to 2 weeks |
Larger organisations should allow more time. For the wider rollout, see our LMS implementation plan, and compare replacement options on the LMS directory.